AirSource TempAir Kurulum, Çalıştırma ve Bakım Talimatları Kılavuzu - Sayfa 13
Hava Kontrol Cihazları AirSource TempAir için çevrimiçi göz atın veya pdf Kurulum, Çalıştırma ve Bakım Talimatları Kılavuzu indirin. AirSource TempAir 20 sayfaları. Air handling units, airsource heatpumps
MAINTENANCE
Fans
Due to the bearing type in EC fans, they are maintenance free. However, once the
Due to the bearing type in EC fans, they are maintenance free. However, once the
Due to the bearing type in EC fans, they are maintenance free. However, once the
grease consumption period has expired (approximately 30000-40000 hours), it is
grease consumption period has expired (approximately 30000
necessary to replace the bearings.
necessary to replace the bearings.
At least every 12 month
At least every 12 months a major inspection of the fan section should be carried out
as follows, whilst observing all relevant safety regulations:
as follows, whilst observing all relevant safety regulations:
Fully isolate electric supply to fan
Fully isolate electric supply to fan-motor.
Do NOT continue until fan impeller has come to a standstill.
Do NOT continue until fan impeller has come to a standstill.
Do NOT use a high
Do NOT use a high-pressure jet or any aggressive, paint solvent cleaning
agents when cleaning.
agents when cleaning.
Inspect and clean the fan if necessary to prevent imbalance due to ingress of
Inspect and clean the fan if necessary to prevent imbalance due to ingress of
Inspect and clean the fan if necessary to prevent imbalance due to ingress of
dirt, using a damp
irt, using a damp cloth.
Be careful to avoid using too much force and damaging the fan impeller.
Be careful to avoid using too much force and damaging the fan impeller.
Be careful to avoid using too much force and damaging the fan impeller.
Keep the airways of the fan free to prevent danger due to flying objects.
Frequent inspection should be made of the fan.
depend on how essential the service, the application operating environment
depend on how essential the service, the application operating environment
depend on how essential the service, the application operating environment, and
number of hours run, but shou
number of hours run, but should not be more than three monthly intervals. On fans
operating in dusty atmospheres or exposed to weather will need to be inspected and
operating in dusty atmospheres or exposed to weather will need to be inspected and
operating in dusty atmospheres or exposed to weather will need to be inspected and
cleaned every 3 months.
cleaned every 3 months.
If a fan is stationary for long periods in a humid atmosphere, it should be switched on
If a fan is stationary for long periods in a humid atmosphere, it should be switched on
If a fan is stationary for long periods in a humid atmosphere, it should be switched on
for a minimum of two hours every month to remove any moisture that may have
minimum of two hours every month to remove any moisture that may have
minimum of two hours every month to remove any moisture that may have
condensed within the motor.
condensed within the motor.
Electric
These should be wired up in accordance with I.E.E. Regulations and local by
These should be wired up in accordance with I.E.E. Regulations and local by-laws. It
These should be wired up in accordance with I.E.E. Regulations and local by
Heater
is essential that the heater contactor is interlocked
essential that the heater contactor is interlocked with the fan starter to prevent
Batteries
the heater being energised when the fans are not running. Additionally, it is
recommended that a fan run on facility is included within the controls to dissipate
recommended that a fan run on facility is included within the controls to dissipate
recommended that a fan run on facility is included within the controls to dissipate
heat form the battery at the end of operation. All
heat form the battery at the end of operation. All heater batteries incorporate a
safety cut-out which must be wired into the controls system. Ensure the size of
cable and contactors are suitable for the load being carried. It is not recommended
cable and contactors are suitable for the load being carried. It is not recommended
cable and contactors are suitable for the load being carried. It is not recommended
for P.V.C. cable to be run into the terminal box. The cable
for P.V.C. cable to be run into the terminal box. The cable should be insulated with
high temperature sleeving.
high temperature sleeving.
Heating
Coils should be inspected every three (3) months to check for build
Coils should be inspected every three (3) months to check for build-up of foreign matter
& Cooling between the fins and that coil and connections are free from leaks. Should any foreign
between the fins and that coil and connections are free from leaks. Should any foreign
between the fins and that coil and connections are free from leaks. Should any foreign
Coils
matter be found, cleaning should be carried out with a high
the air-off face of the coil. Alternatively, the coil can be washed down with a mild
off face of the coil. Alternatively, the coil can be washed down with a mild
off face of the coil. Alternatively, the coil can be washed down with a mild
solution of detergent and water, after which the coil should be thoroughly rinsed
solution of detergent and water, after which the coil should be thoroughly rinsed with
solution of detergent and water, after which the coil should be thoroughly rinsed
clean water. Eliminators should be cleaned down using a soft brush and hot water, any
clean water. Eliminators should be cleaned down using a soft brush and hot water, any
clean water. Eliminators should be cleaned down using a soft brush and hot water, any
sediment cleared out of drain tray and drain pipe, and if necessary repair any areas of
sediment cleared out of drain tray and drain pipe, and if necessary repair any areas of
sediment cleared out of drain tray and drain pipe, and if necessary repair any areas of
corrosion.
Coils located at the high points of the system should be regul
Coils located at the high points of the system should be regularly vented.
s a major inspection of the fan section should be carried out
rways of the fan free to prevent danger due to flying objects.
rways of the fan free to prevent danger due to flying objects.
tion should be made of the fan. General inspection of the fan will
ld not be more than three monthly intervals. On fans
being energised when the fans are not running. Additionally, it is
being energised when the fans are not running. Additionally, it is
out which must be wired into the controls system. Ensure the size of
out which must be wired into the controls system. Ensure the size of
cleaning should be carried out with a high-pressure air line directed at
jet or any aggressive, paint solvent cleaning
General inspection of the fan will
heater batteries incorporate a
should be insulated with
Installation, Operation & Maintenance Manual
stallation, Operation & Maintenance Manual
40000 hours), it is
n starter to prevent
up of foreign matter
pressure air line directed at
arly vented.
12