Draper Acumen E Talimatlar Kurulum ve Çalıştırma - Sayfa 5

Projeksiyon Perdesi Draper Acumen E için çevrimiçi göz atın veya pdf Talimatlar Kurulum ve Çalıştırma indirin. Draper Acumen E 12 sayfaları. Electric projection screen 220v
Ayrıca Draper Acumen E için: Kurulum ve Çalıştırma Talimatları (12 sayfalar)

Draper Acumen E Talimatlar Kurulum ve Çalıştırma
Acumen
XL E & V
Section 5.3 - Ceiling Installation:
1. Attach Ceiling Brackets (minimum of 5) to
.
(see figure at right)
2. Secure the Ceiling Brackets to the ceiling using appropriate hardware
CAUTION: Product is very heavy:
Installer must provide adequate attachment hardware and anchors as required.
Installer must also ensure that structure is of adequate strength
3. Ensure that
mounting brackets
4. Slide all
Bracket Locks
to the center of the case.
5. Holding the case by the endcaps, lift it up and over the cleats on the
18"
Two Ceiling Brackets
16"
(457mm)
(407mm)
Max.
Required
Slide to lock case to
6. Once the case is settled on the mounting brackets, slide the
Mounting Brackets
using the provided hardware
are level.
Ceiling Brackets
Secured to Ceiling
Apart
Wall Bracket Channels
Bracket
for Case Mounting
Bracket Locks
ACUMEN
Ceiling Bracket Assembly
.
(by others)
Ceiling
Mounting
Bracket
Figure 7-B
Figure 7-A
. Wall Bracket Mounting Channels are shown in Fig. 8 below.
mounting brackets
(see Fig. 7)
One Ceiling Bracket
Centered
Optional
Center Bracket
to the center of each
mounting bracket
Ceiling Bracket Assembly
ACUMEN XL
Ceiling Bracket
Assembly
CEILING
ACUMEN XL
SIDE VIEW
Two Ceiling Brackets
16"
Apart
(407mm)
Required
Slide to lock case to
Bracket
and secure set screw on the lock.
(see Fig. 6)
page 5 of 10
Carriage Bolt
Washer
½" Hex Nut
Figure 8