Draper Foundation Kurulum Kılavuzu - Sayfa 13

Projeksiyon Perdesi Draper Foundation için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Draper Foundation 17 sayfaları. Foundation for led panels

Draper Foundation Kurulum Kılavuzu
Foundation
for LED Panels
Section 11.3 - Z - Axis Adjustment
1. Using a 3mm hex wrench, adjust each Wall Adjuster
Bracket until it contacts the wall.
2. Use the clearance hole in the vertical rail to allow for a
socket to drive a lag screw
(by others)
into the wall.
Fig. 11.3-2
3. Rotate the differential screw to push or pull the vertical
rail to be straighter if required.
Fig. 11.3-3
page 24 of 32
1
Fig. 11.3-1
3mm Hex
Wrench
2
WALL ADJUSTMENT BRACKET
Mounting Access Hole
MOUNTING
HARDWARE
(by Others)
WALL
ADJUSTMENT
VERTICAL
BRACKET
RAIL
3
3mm Hex
Wrench
Foundation
for LED Panels
Adjust Wall Adjustment Brackets
Until All Vertical Rails are flush.
Bubble Level recommended.
page 25 of 32
WALL ADJUSTER
BRACKET
ASSEMBLY
Differential
Screw
3mm Hex Wrench