Drawell GI100TW Kullanıcı Kılavuzu - Sayfa 4
Laboratuvar Ekipmanları Drawell GI100TW için çevrimiçi göz atın veya pdf Kullanıcı Kılavuzu indirin. Drawell GI100TW 6 sayfaları.
Range of pressure
gauge
Designed
pressure
Controller
Safety device
Accessories
Optional parts
ⅢOperational Steps:
1. Connect the power ( 36L and 54L got the plug, 80L and 100L, must be
connected to the air switch, connect the power cord to air switch with
power pack, of which, the red line connecting with live wire, green
line with zero and yellow/green line with earth wire. Below is the
power supply requirements: 36L/54L: 16A, 80L/100L: 32A.
(220V,50/60Hz)
2. Turn on the swift on the right side of the operational board. The
machine will do the self checking, all the lights will blink for 3 times,
the "ST-BY" light will be on, it means the machine is on "Stand-by"
status.
3. Open the cover, take off the waste water tank and exhaust hose.
4. Put some water in the waste water tank, the water should be below
the "High" line.
steam trapping bottle
0-0.6Mpa
0.3Mpa
"SMART III" microcomputer control system
Self-induction pressure interlocking device, over temperature
protection system, dry scorch protection system, overpressure
protection, safety valve, over current and short circuit protection,
cover inspection system, leakage protection device, anti-scald
safety protection and automatic troubleshooting system
Stainless steel basket
Printer and printing set
Connect the exhaust to the hose in the back to the