Dream Baby Adapta-Gate F2022 Talimatlar - Sayfa 3
Bebek & Yürümeye Başlayan Çocuk Mobilyaları Dream Baby Adapta-Gate F2022 için çevrimiçi göz atın veya pdf Talimatlar indirin. Dream Baby Adapta-Gate F2022 4 sayfaları.
2.
1. Cut tie and unfold Gate (A) and Gate Panels (B).
3.
Position gate on the floor in desired location with Wall Mounts (E) flat against the wall.
Keep maximum
distance between
fittings X and Y.
X
Position Y as close
to the ground as
25.5in
possible.
If mounting onto
65cm
skirting boards
install using the
spacers on E to
match the distance
from the surface
Y
to the mount.
4.
Use pencil to mark
screw holes positions.
6.
Reposition Gate and drill
screws into place.
E
Ensure
the gate
opens to
desired
direction.
5.
Remove Barrier Gate and drill pilot holes for screws.
Skirting Boards
Use Spacers on top wall
mount to match depth of
fully
the skirting boards.
FOR TIMBER
NOTE: For
plaster/gyprock
surface, locate the
timber beam or
stud behind and mount
in this location
(mounting on
plaster/gyprock alone is
not strong enough and
not safe).
Tighten each Tension Knob (D)
7.
to secure the position.
3
The gate comes with
the One-Way Stopper fitted.
Check gate opening
direction before proceeding
with installation.
E
M
12.6mm / 0.5in
E
M
17.8mm / 0.7in
FOR BRICK/MASONRY
F x8
N x 4
L
F x8
Gx8
NOTE: For brick
or masonry use
Masonry Plugs (G).