Aleo S19 LK280 Hızlı Referans Kılavuzu - Sayfa 14
Solar panel Aleo S19 LK280 için çevrimiçi göz atın veya pdf Hızlı Referans Kılavuzu indirin. Aleo S19 LK280 20 sayfaları.
10.8.2 Module S25, S75
■
Load levels I and II
Bolting
– horizontal/vertical –
min. 1 brace6
Fig.11 Mounting drawing for module S25, S75 at load levels I and II
Dimensions in mm. For a lay-in system, also refer to Ch. 10.5: „Insertion mounting".
■
Load level III
Bolting
– horizontal / vertical –
min. 1 brace6
Fig.12 Mounting drawing for module S25, S75 at load level III
Dimensions in mm. For a lay-in system, also refer to Ch. 10.5: „Insertion mounting".
Page 14/19
Clamping
– Long module side, h/v –
Option1:
Option 2:
Assymetrical
clamping
For 272 ≤ a ≤ 300
select: b ≥ 240 and c
≥ 800
.
a and b can be
exchanged.
min. 1 brace6
Clamping
– Long module side, h/v –
Option 1:
Option 2: Assymetrical
clamping
min. 1 brace6
Clamping
Lay-in system
– Short module side, h./v.–
– Short side, h./v. –
only for on-roof
or free-field installation
only for on-roof
or free-field installation
Clamping
– Short module side, h. / v. –
(7.87 Inch) (7.87 Inch)
Note: max. permitted
suction load 3900 Pa !
(7.87 Inch) (7.87 Inch)
Note: max. permitted
suction load 3900 Pa !
aleo solar GmbH | Marius-Eriksen-Straße 1 | 17291 Prenzlau | Germany | [email protected]
Lay-in system
– Long side, h./v. –
Lay-in system
Lay-in system
– Short side, h. / v. –
– Long side, h. / v. –
only for on-roof
or free-field installation
max. suction load
3900 Pa !
only for on-roof
or free-field installation
max. suction load
3900 Pa !
Quick Reference Manual Rel. 4.2, 08/2015, en-GB-DE (1)