Atlantic Ultraviolet Hygeaire LIND 24-EVO-2PM Kullanıcı El Kitabı - Sayfa 6
Hava Temizleyici Atlantic Ultraviolet Hygeaire LIND 24-EVO-2PM için çevrimiçi göz atın veya pdf Kullanıcı El Kitabı indirin. Atlantic Ultraviolet Hygeaire LIND 24-EVO-2PM 12 sayfaları. Atlantic ultraviolet air disinfection owner's manual
INSTALLATION
I
NSTALLATION OF
1.
The fixture is to be mounted on a plumb, vertical surface, at a minimum height of 6 ½ to 7 feet from the floor.
Installation must be able to support approximately 16 pounds.
2.
Remove thumbscrews and open fixture to expose interior lamp holders and reflectors.
3.
Remove one mounting screw from each end of the reflector so that the reflector will be able to pivot toward the
lamp holder.
4.
Pivot reflectors, on remaining screws, to expose the rear mounting holes and 7/8-inch wire access hole.
5.
All wiring should confirm to state and local electrical codes as well as the current National Electrical Code (NEC).
6.
After mounting and wiring, pivot reflectors back into place and replace mounting screws. Install lamp (packed
separately), close fixture and replace thumbscrews.
6
LIND 24-EVO
Figure 1 - LIND 24-EVO Installation