Atlas LR10 Manuel - Sayfa 7
Kaldırma Sistemleri Atlas LR10 için çevrimiçi göz atın veya pdf Manuel indirin. Atlas LR10 18 sayfaları.
D. Install Electric System
Refer to electric schenatic diagram, connect the power supply according to the
requirement of motor nameplate.
attention to the
direction of motor rotation
PEAK Wire connection for single phase hydraulic power unit motor (Fig.8)
1. Power supply wires (Live wire L and Zero wire N) connected with the two wires on
A.C.contactor terminal marked L1 L2 respectively.
2. Two wires on hydraulic power unit motor connected with A.C.contactor terminal marked
T1 T2 respectively.
3. A.C. contactor A2 connected with L2.
4. Two wire on button switch connected with A.C. contactor terninal marked A1 L1.
PEAK hydraulic power unit motor wiring
P
O
W
E
R
A.C. connector
Push button
SPX Wire connection for single phase
hydraulic power unit motor(See Fig.9)
Power supply live wire L connected with button switch wire 4 .
Button switch wire 3 connected with motor wire 6#.
Motor wire 5# connected with power supply zero wire (N).
P
O
W
E
R
Push button
Spx Wire connection for single phase
hydraulic power unit motor
Note: The lift must be good grounding and pay
when using 380V motor.
Fig.8
G
N
L
Fig.9
7
Electric schematic diagram
Push button
Connected with
earth wire
5
6
4
3