Advanced Poly-Packaging Advanced Poly-Bagger T-1000 Talimatlar Kılavuzu - Sayfa 4
Endüstriyel Ekipmanlar Advanced Poly-Packaging Advanced Poly-Bagger T-1000 için çevrimiçi göz atın veya pdf Talimatlar Kılavuzu indirin. Advanced Poly-Packaging Advanced Poly-Bagger T-1000 6 sayfaları. Drop frame
Ayrıca Advanced Poly-Packaging Advanced Poly-Bagger T-1000 için: Nasıl Yapılır (3 sayfalar)
Press and hold JOG+ until the perforation that was under the Perf Sensor is above
the opening for the Heater Bar. The actual distance above the opening will depend
on the size of the bag; it should not be more than about an inch.
There is no set distance; you will have to do trial and error to see what works for
you.
Note: It is normal for the bagger to advance the bag very slowly.
Heater Bar
Press Zero Seal.
Page 4 of 6