ABSCO SHEDS 15081SECO Montaj Talimatları Kılavuzu - Sayfa 2
Dış Mekan Depolama ABSCO SHEDS 15081SECO için çevrimiçi göz atın veya pdf Montaj Talimatları Kılavuzu indirin. ABSCO SHEDS 15081SECO 17 sayfaları. Eco shed
GENERAL INSTRUCTIONS
Before commencing any assembly, read through these instructions in
detail to gain a thorough understanding of assembly methods and
associated details.
Unpack the carton and carefully identify and check off all the parts
against the parts described and illustrated on pages three and four.
SITE PREPARATION
The site for the shed must be level.
It is recommended that the shed be set on a 100mm concrete slab and
anchored down appropriately (refer last page for details).
Anchor sets are not supplied as standard items with this product.
TOOLS REQUIRED
A NOTE ON SAFETY
Some parts may have sharp edges. It is advisable to wear gloves when
handling these items and safety glasses if drilling holes. Sensible shoes
are highly recommended.
Do not erect your shed in windy conditions, ensure that the shed is
securely anchored to a solid foundation immediately after construction is
completed.
It is highly recommended to erect the shed with two or more people.
ABSCO INDUSTRIES
Absco ECO Shed
Model: 15081SECO
3mm
4mm
ASSEMBLY INSTRUCTION - MODEL: 15081S 22/10/13
OPTIONAL
PAGE 2