ABSCO SHEDS 1508WBCK Manuel - Sayfa 5
Dış Mekan Depolama ABSCO SHEDS 1508WBCK için çevrimiçi göz atın veya pdf Manuel indirin. ABSCO SHEDS 1508WBCK 20 sayfaları. Bin cover
Guide on Joining Spliced Channels
The text marked on all parts must be shown on the same side as each other
=
CSJ
JOIN>>
<<JOIN
Step 1.
Position the channels and the
CSJ joiner so the centre of
the CSJ is in line with the end
of each channel to be joiner
together.
=
=
JOIN>>
Step 3.
Join the second channel to the
CSJ by positioning the <<JOIN
of the channel at the centre of
the CSJ, on an angle. Push the
CSJ into the channel until you
hear a 'click'.
Absco Industries
Assembly Instruction Manual
ABSCO BIN COVER
MODEL: 1508WBCK
1.52m W x 0.78m D x 1.15m H
=
Step 2.
Join the fi rst channel to the CSJ
by inserting the centre of the
CSJ, on an angle, to the end of
the channel where the JOIN>>
text is marked.
Finished Channel.
The joined channels should
now look like the picture with
the CSJ positioned equally
inside of the joined channels.
JOIN>>
JOIN>>
<<JOIN
=
=
Model: 1508WBCK
=
JOIN>>
SJ
Push down one side of the CSJ
until you hear a 'click'.
Drill out holes with 3mm drill
bit in CSJ to match the holes
in channel. Drilling of screws
on the joined channels is being
done after sheets are locked on
the spliced channels.
.
Push
...
20mm
Finished Spliced
Channel
15/09/2022
2.1
=
CSJ
Channel
15mm
5