Advanced Radiant Systems CS5-18-VD-TB2 Kullanım ve Bakım Kılavuzu - Sayfa 8
Dondurucu Advanced Radiant Systems CS5-18-VD-TB2 için çevrimiçi göz atın veya pdf Kullanım ve Bakım Kılavuzu indirin. Advanced Radiant Systems CS5-18-VD-TB2 16 sayfaları. Cool-space, glacier tall base
5.2 Daily maintenance
When shutting down the COOL-SPACE
turned off approximately 15 minutes before the fan is turned off. This will allow the pads to
drain and dry out. To avoid disfiguring the housing the unit should be drained after every
use. These simple guidelines will ensure long and efficient pad life as well as help to
control mildew and bacteria growth, and unit longevity.
5.3 Periodic maintenance
Disconnect the power supply before performing any service or maintenance on the unit.
Failure to do so may result in serious injury or death.
Depending on how often the COOL-SPACE
performed anywhere from every week for heavy use to monthly for light use. Shut down the
unit and drain the water sump. The cooling pads act as a filtering agent and remove dust and
other particles from the incoming air stream. These particles will flow into the sump and collect
there. Also, impurities in the water will collect in the sump.
1. Close the water flow valve and open the drain valve.
2. Run pump until sump is dry then immediately shut off pump.
3. Turn unit off and disconnect the power supply.
4. Remove cooling pads, refer to section 5.1.
5. Clean out reservoir with either a towel or wet/dry vacuum.
6. Remove the water spray bar and its plug. Insure holes are free of debris.
7. Reinstall pads and pad retainer.
To keep the COOL-SPACE
kept clean and dust-free. Dust and other particles have an adverse effect on the media's ability
to introduce water into the air stream. If the pad surface becomes dirty or dusty, clean with a
soft brush and water.
5.4 Storage
1. Remove the pads, as described in section 5.1
2. Clean with a soft brush and water to remove dust and debris
3. Drain sump using procedure described in section 5.3 and wipe dry
4. Store the COOL-SPACE
unit at the end of each use, the pump should be
®
ELECTRICAL SHOCK HAZARD
®
unit operates, this procedure should be
Draining the Water Sump
unit operating at peak efficiency, ensure that the cooling pads are
®
unit in a dry area. Cover if possible to prevent dust build-up.
®
5