Ankom TDF23 Servis Prosedürü
Ölçüm Cihazları Ankom TDF23 için çevrimiçi göz atın veya pdf Servis Prosedürü indirin. Ankom TDF23 9 sayfaları. Paddle bar replacement
This procedure is to help facilitate the replacement of the TDF23 Paddle Bar Assembly on the ANKOM
Analyzer.
Note: The following items will be sent in a replacement package as part of the TDF23 Paddle Bar Replacement Kit.
New Paddle Bar Assembly
Loctite
1 Shoulder Screw
1.
Prepare the instrument for service.
a. Power off the instrument.
b. Remove the clear back panel of the TDF instrument by
removing the six acorn nuts using a 3/8" nut driver
(provided with the original instrument purchase).
2.
Tilt the instrument forward (if necessary) for easy access
to the back of the TDF.
a.
Unscrew the two black Service Access screws on the
upper right and left sides of the instrument (near the
ends of Clamp Bar A).
b. Remove the four front clamp bars and set them aside.
c.
Clear the area in front and immediately behind the
instrument of any items that might be in the way.
d. Tilt the instrument forward, careful to guide it down
slowly to ensure no tubing gets caught or pinched in the
machine.
ANKOM Technology 2052 O'Neil Road Email: [email protected] Phone: 315-986-8090 Fax: 315-986-8091
Paddle Bar Replacement
TDF
4 Shims (0.015)
2 Screws #8269
Depth gauge
Service Procedure
5/32" Hex key wrench
3/32" Hex key wrench
1/8" Hex key wrench
6 Acorn Nuts
Service
Access
Screws
Remove
Clamps
Tilt
Forward
TS021
Revised: 01/24/2017
TDF
Dietary Fiber
pg. 1 of 9