Ankom TDF69 Servis Prosedürü - Sayfa 4

Ölçüm Cihazları Ankom TDF69 için çevrimiçi göz atın veya pdf Servis Prosedürü indirin. Ankom TDF69 4 sayfaları. Vacuum sensor installation

4.
Secure the cable.
a. Secure the cable by sliding a cable tie behind
the cable tie holder and tightening the tie to the
cable.
b. Cable tie the vacuum sensor cable to the thick
control panel cable.
c. Cut off the excess cable ties.
5.
Test the instrument.
a. Turn on the instrument.
b. Press the Diagnostics button on the touch screen
display.
c. Press the Pressures button on the touch screen
display.
d. Ensure the vacuum sensor reads, 14-15 psi (at
sea level).
6.
Re-Install the panels.
a. Reattach the stainless steel (SS) back panel of
the electrical enclosure.
b. Reattach the clear back panel of the instrument
using the six acorn nuts.
ANKOM Technology  2052 O'Neil Road  Email: [email protected]  Phone: 315-986-8090  Fax: 315-986-8091
Vacuum Sensor Installation
TDF
Cable ties
Cable tie holder
Control
panel cable
SS back panel to
electrical enclosure
013
Service Procedure
Revised: 07/16/2014
Acorn Nuts (the top two
are behind the black bar)
pg. 4 of 4