Daikin FTE50KV19 Servis Kılavuzu - Sayfa 7
Hava Kontrol Cihazları Daikin FTE50KV19 için çevrimiçi göz atın veya pdf Servis Kılavuzu indirin. Daikin FTE50KV19 20 sayfaları. Removal procedure, 5.0/6.0/7.1 kw class, 15000/18000 btu/h class
Ayrıca Daikin FTE50KV19 için: Servis Kılavuzu (20 sayfalar)
![Daikin FTE50KV19 Servis Kılavuzu](/uploads/products/server2/1534726/1534726.jpg)
Si041254EE
4. Horizontal Blades
Warning
Step
1
Bend the horizontal
blade (lower) slightly
and release the 2
center shafts.
2
Release the left shaft.
3
Slide the horizontal
blade (lower) to the left
and release the right
shaft.
4
Remove the horizontal
blade (upper) in the
same way.
Removal Procedure
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Procedure
Left shaft
Center shaft
Horizontal blade
(upper)
Horizontal blade
(lower)
(R21152)
Right shaft
(R2766)
Horizontal Blades
Points
When reassembling, mount
the large horizontal blade to
the upper position and the
small horizontal blade to the
lower position.
Installation procedure
1. Fit the horizontal blade to the
right shaft first. Make sure to
rotate the horizontal blade so
the shaft fits correctly.
2. Fit the horizontal blade to the
center and left shafts.
5