DAIREN SSW 24-4ND Kullanım Kılavuzu - Sayfa 3

UPS DAIREN SSW 24-4ND için çevrimiçi göz atın veya pdf Kullanım Kılavuzu indirin. DAIREN SSW 24-4ND 11 sayfaları. 24v ups

2) Wiring connection

The wire connection of AC supplies, load, and battery to the terminal
block are shown as below:
Terminals
Connection
220V_L
Mains line wire
220V_N
Mains neutral wire
E
Earth wire
LS/LT
Loads line wire
NS/NT
Loads neutral wire
BAT+
Battery positive
BAT-
Battery negative
P1/P2
DC loads positive
N1/N2
DC loads negative
Cautions :
Ensure power supply at the input MCB and maintenance switch is
switched off before making any connections.
Observe correct polarity of battery terminals. Batteries are
connected in series (24V system)
220VAC
Revision: 01
Operation Manual of 24V UPS
MAX
120W
Input
Load
Date: Dec.5. 2021
Cable size (sq.mm)
>1.5
>1.5
>2.5
>1.5
>1.5
>4.0
>4.0
>1.5
>1.5
MAX
120W
Load
Page
of
3
10