2.Install the inverter on the hanging plate, and ensure that lugs of
the inverter are properly matched with slots of the hanging plate.
3.Secure the inverter with bolts.
I
3.Electrical Connection
Step 1: Secondary Ground Connection
Lock crimped ground cables to ground holes with screw locks on
the inverter case, and paint the ground screws and ground terminals
to improve anti-corrosion characteristics.
The conductor sectional area of each ground cable is 0.5~10 mm
(4~6 mm
is recommended).
2
I
Step 2: AC Side Connection
Recommended Specification:
Cable Type
Outer Diameter (mm) Conductor Sectional Area (mm
L1,L2,L3,(N) cables: 70~240
AC Cable
38~56
1.Open the AC side wiring box with a 5mm internal hexagon
wrench. Open the breaker and prevent its accidental reclose.
2.Unscrew the lock nut of the waterproof connector and take out
multilayer sealing rings. Select the sealing ring based on the cable
outer diameter. Route the cable through the lock nut and sealing ring.
2 PCS of M6*50 bolts
3.Peel off the protective layer and insulation layer of a certain
length and crimp the cold-pressed terminals as shown below:
2
4.Secure cables to the corresponding terminals with a hexagon
socket wrench and cross screwdriver, and tighten the waterproof
cable heads.
L1
L2
)
2
PE
PE: 0.5~10
4
Internal hexagon wrench
Remove this sealing
ring when the diameter
D≥47mm.
D
L=E+2~3mm
L1
L2
L3
N
PE
≤270mm
E
N
L3
If the PE cable is connected
separately, route the cable
through the spare waterproof
cable head.
Step 3: DC Side Connection
1.Turn off the DC swtich.
2.It is recommended that the DC cable dedicated to photovoltaics
(2.5~4 mm²) be used to connect the PV module.
3.Trim about 6mm of insulation from the cable end.
4.Searate the DC connector as below.
Plug
5.Insert multiple cables connected to the PV module into the pin
plug and ensure all strands are captured in the pin plug.
6.Crimp the pin plug wtih a crimping plier.
7.Route the crimped cable through the nut into the plug. When you
hear a "click", the pin plug is properly clamped in the plug.
L1
L2
L3
N
PE
·
4.Startup Procedure
-
After checking all connections are proper, turn on the external
DC/AC breakers.
-
Turn the DC switch to "ON".
-
The inverter will start automatically when PV panels generate
enough energy, and the LED will turn blue.