MDI-X (crossover cable)
100Base-FX Fiber Port
100Base-FX fiber port needs to be used in pairs. TX is
transmission side to connect to receiving side RX in remote
switch;
Suppose: If you make your own cable, we suggest labeling
the two sides of the same line with the same letter (A-to-A and
B-to-B, shown as below, or A1-to-A2 and B1-to-B2).
【LED Indicator】
LED indictor is in the front panel of IES3016L. The function
of each LED is described in the table as below.
System indication LED
LED
state
PWR1
PWR2
Alarm
SYS
Link1~16
【Installation】
Before
environment meet the installation requirement, including the
power needs and abundant space, whether it is close to the
connection equipment and other equipments are prepared or not.
Examine the cables and plugs that installation requirements.
Examine whether the cables be suitable or not (less than 100m)
according to reasonable scheme.
Screw, nut, tool provided by yourself.
Power
inputs(12~48DC)
Environment: -40°C to 75°C
Relative humidity 5% to 95%
Description
ON
Power 1 is working.
PWR1 is not connected or does
OFF
not run normally.
ON
Power 2 is working.
PWR2 is not connected or run
OFF
normally.
Power or port link is broken or
ON
failure.
power and port link is working
OFF
well
ON/OF
Device does not run normally
F
Blink
Device runs well.
Network connection of the port
ON
is valid
Blink
Data is being transmitted
Network connection of the port
OFF
is invalid
installation,
please
confirm
that
need:
Redundant,
dual
24VDC
Wiring Requirements
Wiring need to meet the following requirements:
It is needed to check whether the type, quantity and
specification of cable match the requirement before
cable laying;
It is needed to check the cable is damaged or not, factory
records and quality assurance booklet before cable
laying;
The required cable specification, quantity, direction and
laying position need to match construction requirements,
and cable length depends on actual position;
All the cable cannot have break-down and terminal in
the middle;
Cables should be straight in the hallways and turning;
Cable should be straight in the groove, and cannot
beyond the groove in case of holding back the inlet and
outlet holes. Cables should be banded and fixed when
they are out of the groove;
User cable should be separated from the power lines.
the
work
Cables, power lines and grounding lines cannot be
overlapped and mixed when they are in the same groove
road. When cable is too long, it cannot hold down other
cable, but structure in the middle of alignment rack;
Pigtail cannot be tied and swerved as less as possible.
Swerving radius cannot be too small (small swerving
causes terrible loss of link). Its banding should be
moderate, not too tight, and should be separated from
power
other cables;
It should have corresponding simple signal at both sides