Auburn Gear Power Wheel Model 145 Servis Kılavuzu - Sayfa 2
Mikrofon sistemi Auburn Gear Power Wheel Model 145 için çevrimiçi göz atın veya pdf Servis Kılavuzu indirin. Auburn Gear Power Wheel Model 145 4 sayfaları. Double reduction
wheel drives
Ayrıca Auburn Gear Power Wheel Model 145 için: Servis Kılavuzu (4 sayfalar)
IMPORTANT: All Power Wheel units and kits are shipped with a label that includes the Auburn Gear part number, order code and work order.
Power Wheel
ASSY. CODE
Example:
60003045
145W 3C14510Z
12078
WORK ORDER
Auburn Gear
MH 550
AUBURN, IN U.S.A .
In addition to the label, Power Wheel drives are stamped with the last four digits of the part number and date code, which appears on the cover or
hub flange as shown.
Example: 3045 12078
When ordering parts, the information included on the label or the stamped part number is necessary to accurately identify the drive
and obtain the correct replacement parts. Once this information has been obtained, contact Auburn Gear for the appropriate parts list.
STEP 1
Slide the coupling (2) out of spindle (3).
STEP 2
Position the assembly upright on face of spindle (3).
STEP 3
Remove the disengage cover (30) if necessary.
STEP 4
Remove twenty-four bolts (28), flat washers (27) and large cover (26).
Disengage plunger (25) usually remains with large cover (26). Remove
plunger (24) and "O" ring (25) from cover (26). The thrust washer (23)
will not remain in position on the thrust face of large cover (26).
STEP 5
Remove primary sun gear (22) from end of input shaft (15).
STEP 6
Remove the primary carrier assembly (21).
STEP 7
Remove the secondary carrier assembly (20).
STEP 8
Remove the input shaft (15) from spindle (3). Remove the retaining
rings (16), thrust washers (17), and disengage spring (18) from input
shaft (15) only if replacement is required.
STEP 1
Press new bearing cups (7 & 10) in each side of the hub (9). It is
recommended that bearing cups (7 & 10) and cones (6 & 11) be
replaced in sets.
STEP 2
Assemble bearing cone (6) into cup (7) at seal end of hub (9) and
press a new seal (5) into hub (9). Install boot seal (4) on hub (9) if unit
is so equipped.
STEP 3
Position spindle (3) upright on bench. Lubricate lips of seals (4) and
(5) and lower hub (9) onto spindle (3). Hub (9) should be centered as
it is lowered over spindle (3) to prevent seal damage.
N
: [On heavy duty seals (order code T) there is to be no
OTE
lubrication on seal (5), spindle (3), or hub (9)].
STEP 4
Press inner bearing cone (11) onto spindle (3) until rollers just contact
inner bearing cup (10) using bearing cone driver 598F. Install tab of
thrust washer (12) into slot of spindle (3). Place lock washer (13) onto
spindle (3).
MH674-0412
IDENTIFICATION
R
DISASSEMBLY OF POWER WHEEL
ASSEMBLY OF POWER WHEEL
STEP 9
Remove ring gear (19) from hub (9). It may be necessary to
strike ring gear (19) with a rubber mallet to loosen from hub (9).
STEP 10
One tab of lock washer (13) will be engaged in slot of bearing nut (14);
bend tab back to release. Remove the bearing nut (14), lock washer
(13) and thrust washer (12). NOTE: A special locknut wrench, 593RR,
is required for the removal of the bearing locknut. Contact Auburn Gear
to purchase wrench and other service tools.
STEP 11
Place assembly in press with spindle (3) down on hub flange (9). Place
material under spindle so not to damage when it's pressed out of hub.
Care should be taken to avoid damaging splines and threads on
spindle while pressing it out. NOTE: Bearing cone (11) has been
designed with a press fit with respect to spindle (3). Considerable force
will be required to remove cone (11) from spindle (3).
If a press is not available you will need the 598FF Spindle/Shaft
removal tool. Place the small disk on the end of the spindle/shaft (3).
Mount the cross tube to the hub (9). Turn the screw against the small
disk, DO NOT use an impact gun. Turning the screw will force the
spindle/shaft (3) out of the bearing cone (11).
STEP 12
Remove the oil seal (5) & boot seal (4), if included and bearing cones
(6 & 11) from hub (9). Inspect bearing cups (7 & 10) in position and
remove only if replacement is required.
STEP 5
Torque bearing nut (14) to 50 lb-ft (68 N-m) using tool 593RR.
STEP 6
Rotate hub (9) several revolutions in each direction to allow bearings
to seat.
STEP 7
Using an appropriate pick, check each roller of the inner bearing cone
(11) for looseness.
STEP 8
If all rollers are tight, proceed to step 13.
STEP 9
With bearing nut tool 593RR placed on bearing nut (14), tap end of
bearing nut tool with an appropriate hammer to advance the inner
bearing cone (11) further onto shaft (1).
STEP 10
Repeat steps 5 thru 9 until all inner bearing cone rollers are tight.