concept 2 PM5 Manuel - Sayfa 11

Fitness Ekipmanları concept 2 PM5 için çevrimiçi göz atın veya pdf Manuel indirin. concept 2 PM5 13 sayfaları. Performance monitor
Ayrıca concept 2 PM5 için: Hızlı Başlangıç Kılavuzu (4 sayfalar), Hızlı Başlangıç Kılavuzu (3 sayfalar)

concept 2 PM5 Manuel

MAINTENANCE

WARNING: The safety level of the machine can be maintained only if it is examined regularly for damage
and wear. Replace defective components immediately to ensure safety and performance or keep machine out of
use until repair.
RECOMMENDED MAINTENANCE SCHEDULE
On a Regular Basis
Utility that makes it easy to update your PM with the latest firmware version at any time.
Visit concept2.com/pm5firmware for more information.
Daily:
Wipe seat and rail assembly
clean with a cloth or non-
abrasive scouring pad after
bleach or coarse abrasives.
IMPORTANT: To ensure the
quality feel of the foot carriage
is vital that this area be cleaned
on both sides of monorail
after every use. If this area is
stretcher movement will feel
bumpy and rough.
Every 50 Hours of Use
(Weekly for Institutional Users):
1. Clean and lubricate the chain with one teaspoon of purified
a paper towel and run along the chain. Wipe off excess.
Repeat if needed.
2. Inspect drive cord for wear. The drive cord is a single
cord that is connected to the handle on one end
and the foot carriage on the other end. Inspect the
the handle all the way out.
®
oil or 20w motor oil. Apply oil to
2
1
pull handle out
New cord
Acceptable wear.
Still usable.
Excessive wear.
Replace cord.
11