3onedata ES2010G-2GF Kullanıcı Kılavuzu - Sayfa 3

Ağ Yönlendiricisi 3onedata ES2010G-2GF için çevrimiçi göz atın veya pdf Kullanıcı Kılavuzu indirin. 3onedata ES2010G-2GF 4 sayfaları. Full gigabit ethernet switch

3onedata ES2010G-2GF Kullanıcı Kılavuzu
Suppose: If you make your own cable, we suggest labeling
the two sides of the same line with the same letter (A-to-A and
B-to-B, shown as above, or A1-to-A2 and B1-to-B2).

【LED Indicator】

LED indictor light on the front panel of product, the function of
each LED is described in the table as below.
System indication LED
LED
State
Description
Power is being supplied to power
ON
input PWR input
P1, P2
Power is not being supplied to
OFF
power input PWR input
Port connection regular.
ON
LINK/ACT
Blinking
Port connection active
(G1~G10)
OFF
Port had no connection.
【Installation】
Before installation, confirm that the work environment meet the
installation require, including the power needs and abundant
space. Whether it is close to the connection equipment and other
equipments are prepared or not.
1. Avoid in the sunshine, keep away from the heat fountainhead or
the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3. Examine whether the cables be seemly or not (less than 100m)
according to reasonable scheme.
4. Power: 12-48VDC power input
5. Environment: working temperature: 0~55℃
Storage Temperature: -10~65℃
Relative humidity 5%~95%
DIN Rail Installation
In order to use in industrial environments expediently, the product
adopt 35mm DIN-Rail installation, the installation steps as below:
1. Examine the DIN-Rail attachment
2. Examine DIN Rail whether be firm and the position is
suitability or not.
3. Insert the top of the DIN-Rail into the slot just below the
stiff metal spring.
4. The DIN-Rail attachment unit will snap into place as shown
below.
Wiring Requirements
Cable laying need to meet the following requirements,
1. It is needed to check whether the type, quantity and
specification of cable match the requirement before cable
laying;
2. It is needed to check the cable is damaged or not, factory
records and quality assurance booklet before cable laying;
3. The required cable specification, quantity, direction and
laying position need to match construction requirements, and
cable length depends on actual position;
4. All the cable cannot have break-down and terminal in the
middle;
5. Cables should be straight in the hallways and turning;
6. Cable should be straight in the groove, and cannot beyond the
groove in case of holding back the inlet and outlet holes.
Cables should be banded and fixed when they are out of the
groove;
7. User cable should be separated from the power lines. Cables,
power lines and grounding lines cannot be overlapped and
mixed when they are in the same groove road. When cable is
- 3 -
too long, it cannot hold down other cable, but structure in the
middle of alignment rack;
8. Pigtail cannot be tied and swerved as less as possible.
Swerving radius cannot be too small (small swerving causes
terrible loss of link). Its banding should be moderate, not too
tight, and should be separated from other cables;
9. It should have corresponding simple signal at both sides of the
cable for maintaining.
【Specification】
Technology
Standard: IEEE802.3, IEEE802.3u, IEEE802.3x, IEEE802.3z,
IEEE802.3ab
Flow control: IEEE802.3x, back pressure control
Interface
Electric port: 10Base-T/100Base-TX/1000 Base-TX auto speed
control, Half/full duplex and MDI/MDI-X auto detect
1000M optic fiber port: 1000Base-FX, SC/ST/FC connector
Exchange of attribute:
Transmission: Store and forward
System exchange bandwidth: 20Gbps
Memory: 1Mbit
MAC address: 8K
LED indicator
Interface indicator: Link (G1~G10)
DC Power supply indicator: P1, P2
Transfer distance
Twisted cable: 100M (standard CAT5/CAT5e cable)
Multi-mode: 1310nm, 2Km
Single-mode: 1310nm, 20/40Km
1550nm, 60/80/100/120Km
Power supply