Anzzi VANZER SP-AZ037 Kurulum Kılavuzu - Sayfa 6

Banyo Armatürleri Anzzi VANZER SP-AZ037 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Anzzi VANZER SP-AZ037 16 sayfaları.

Anzzi VANZER SP-AZ037 Kurulum Kılavuzu
INSTALLATION (SETUP)
Figure A
IMPORTANT
Before drilling any holes for the shower panel brackets, ensure there are no hidden cables or
pipelines aligned with the desired drilling position.
Step A
Drill the two holes for the top bracket 1" apart at the desired height.
Step A.2
Drill the two holes for the bottom bracket 1" apart at approximately 45" below the top bracket.
PERFECTION IS OUR TRADITION™
pg. 4