Anzzi SB-AZ012WL Kurulum ve Bakım Kılavuzu - Sayfa 6
Sıhhi Tesisat Ürünleri Anzzi SB-AZ012WL için çevrimiçi göz atın veya pdf Kurulum ve Bakım Kılavuzu indirin. Anzzi SB-AZ012WL 8 sayfaları. Shower base
INSTALLATION
Position the shower base over so the waste drain and the
04
drainage pipe are aligned. The shower base should butt up
against the drywall.
Lower the base over the drain and set against the studs.
See Fig. 4
Left Hand
Right Hand
Mix your bedding material (i.e. mortar or cement-sand). It is NOT
05
RECOMMENDED to use concrete or plaster. Apply enough
bedding to support the complete bottom of the base. This will
make sure the base will not shift positions as well as provide
additional stability.
See Fig. 5
Left Hand
Alcove
Alcove
Right Hand
6