Anzzi SH-AZ033 Kurulum Kılavuzu - Sayfa 6
Sıhhi Tesisat Ürünleri Anzzi SH-AZ033 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Anzzi SH-AZ033 16 sayfaları.
INSTALLATION
Figure 1
Step 1A
Remove the protective covers (5a) by turning counter clockwise and sliding them out.
Step 1B
Do not remove protective cover (5b) until you make sure the cover is flush with the finished
wall.
Step 1C
Using a Philips screwdriver, unscrew and remove the two screws (4).
Step 1D
Now remove the remaining protective cover (5b).
PERFECTION IS OUR TRADITION™
5a
4
5b
pg. 4