Anzzi THYME SH-AZ030 Kurulum Kılavuzu - Sayfa 9

Sıhhi Tesisat Ürünleri Anzzi THYME SH-AZ030 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Anzzi THYME SH-AZ030 16 sayfaları.

INSTALLATION
Figure 4
O-r i n g
3
Step 4A
Apply Teflon tape to the shower arm (#2) then place shower arm flange (#1) on shower pipe
and screw shower arm to the pipe.
Step 4B
After shower arm is in place screw the shower head (#3) onto the arm.
Important:
Make sure the O-ring is placed in between the shower arm (#2) and the shower
head (#3).
PERFECTION IS OUR TRADITION™
2
1
2
O - ring
3
15
14
18
1
pg. 7