Cascade 100C Kurulum Talimatları Kılavuzu - Sayfa 5
Forkliftler Cascade 100C için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Cascade 100C 10 sayfaları.
I
NSTALLATION
3
Mount Fork Positioner on truck
A
Center truck behind Attachment.
B
Hang Attachment onto truck carriage.
C
Engage upper mounting hooks. On
sideshifting units, make sure upper bearings
are in place and centering tab engages
center notch on truck carriage.
ITA Class II – 0.60–0.66 in. (15–17 mm)
ITA Class III – 0.72–0.78 in. (18–20 mm)
ITA Class IV – 0.72–0.78 in. (18–20 mm)
ITA Class II – 0.32–0.36 in. (8–9 mm)
ITA Class III – 0.39–0.43 in. (10–11 mm)
ITA Class IV – 0.47–0.51 in. (12–13 mm)
4
Install or engage lower hooks
BOLT-ON TYPE
Tap tight into position.
If sideshifting, back off
1 notch and
check clearance:
3/32 in. (2.4 mm) min.
3/16 in. (4.8 mm) max.
Tighten Capscrews:
Class II, III Mounting – 120 ft.-lbs. (165 Nm)
Class IV Mounting – 190 ft.-lbs. (255 Nm)
Upper Hook
(Full-length
Sideshifter
type shown)
Center
Notch
Truck
Carriage
SS0139.ill
Back (Driver's) View
Lower
Carriage
Bar
S T
J U
A D
Slide hook up
to engage
bar, install
pin in locked
position.
(upper hole.)
SS0140.ill
B
FP0213.ill
QUICK-CHANGE TYPE
(optional)
Lower
Carriage
Bar
e
®
a d
s c
c a
- 1
1 4
5 5
6 7
C -
SS0141.ill
C
SD0023.ill
Upper Bearings
Inspect hooks for
excessive clearance.
(Reverse guides to
reduce clearance –
see Step 2.)
3/16 in.
(4.8 mm)
max.
3