Cascade 100K Kurulum Talimatları Kılavuzu - Sayfa 3
Forkliftler Cascade 100K için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Cascade 100K 10 sayfaları. Fork positioner/sideshifter
Ayrıca Cascade 100K için: Kullanıcı Kılavuzu (20 sayfalar)
5
Remove any existing fittings from the sideshift cylinder
ports. Install the new supply manifold and fittings to the
sideshift cylinder ports. Do not remove the flow restrictor
washers from the cylinder ports.
6
Install the kit hoses. Route the hoses to prevent wear and
pinch points.
7
Install supply hoses from the mast internal reeving fittings
to the sideshift cylinder supply fittings. Route the hoses to
prevent wear and pinch points.
3
FP0960.eps
Remove
existing
fittings
5
6
FP0956.eps
7
Mast reeving
fittings
FP0957.eps