Cascade 120K Kurulum Talimatları Kılavuzu - Sayfa 2
Forkliftler Cascade 120K için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Cascade 120K 10 sayfaları. Fork positioner/sideshifter
Ayrıca Cascade 120K için: Kullanıcı Kılavuzu (20 sayfalar)
Component Installation
1
Mount the guard to the sideshifter lower carriage bar.
Tighten the capscrews to a torque of 25 ft.-lbs. (35 Nm).
2
Install the hoses to the valve fittings with the hose length
orientation shown. Tighten the hose ends with the natural
bend of the hoses upward. Install the diode to the solenoid
coil.
3
Install the solenoid valve to the bracket. Tighten the
capscrews to a torque of 4 ft.-lbs. (5 Nm).
4
Install the bracket to the guard. Tighten the capscrews to
a torque of 25 ft.-lbs. (35 Nm).
FP0959.eps
FP0958.eps
4
2
FP0783.eps
1
4
3