Cascade 55G Kullanıcı Kılavuzu - Sayfa 10
Forkliftler Cascade 55G için çevrimiçi göz atın veya pdf Kullanıcı Kılavuzu indirin. Cascade 55G 16 sayfaları. Fork positioner
INSTALLATION
5
Flush supply hoses
A
Connect supply hoses to truck supply
terminals and connect together using a
union fitting as shown.
B
Operate auxiliary valve for 30 sec.
C
Remove union fitting.
7
Install forks
A
Remove capscrews and fork carrier inner
retainers.
B
Install forks using a pallet or blocks. Keep
feet clear of forks.
C
Reinstall fork carrier inner retainers and
spacers. Tighten capscrews to 35 Nm.
9
6
Sideshift Left
(if equipped)
FP0726.eps
2 mm
minimum
clearance
Capscrews
FP0903.eps
Install hoses
OPEN
CLOSE
Forks
Forks
Front View
Add spacers to match fork
width. Leave 2 mm minimum
loose clearance on side of fork.
Fork Carrier Inner Retainer –
Make sure retainer is not tight
against side of fork.
Sideshift Right
(if equipped)
FP0882.eps
SS0639.eps
6047782-R2 EN