Addie Water Systems OXIDIZER PLUS Kullanıcı El Kitabı - Sayfa 17
Su Sistemi Addie Water Systems OXIDIZER PLUS için çevrimiçi göz atın veya pdf Kullanıcı El Kitabı indirin. Addie Water Systems OXIDIZER PLUS 19 sayfaları. Chemical free sulfur reduction
Brine Valve Replacement
1. Move the integral stainless steel bypass to the bypass position.
2. Relieve the water pressure in the Iron Genie by holding down the Extra Cycle button for 5 seconds.
Once in the "BW" cycle pressure will be relieved.
3. Push extra cycle button to move control valve to "BD" cycle.
4. Push extra cycle to return the control valve to the service position (time of day on display).
5. Unplug Power Head from electrical outlet.
6. Remove the control valve back cover.
7. Remove black screw and silver washer at drive yoke.
8. Remove 2 silver timer mounting screws.
9. Lift off entire Power Head assembly.
10. Remove the two injector body mounting screws.
11. Slide the injector body away from control valve.
12. Pull brine valve from injector body.
13. Discard o-ring at bottom of brine valve hole in injector body.
14. Install new o-ring at bottom of brine valve hole in injector body.
15. Press brine valve into brine valve hole in injector body. Be sure shoulder bushing on brine valve is
flush with injector body.
16. Slide injector body onto control valve.
17. Insert screws through injector cap and injector body in to mating holes in the valve body. Tighten
screws.
18. Put Power Head on top of control valve. Be sure drive pin on main gear engages slot in drive yoke.
19. Replace black screw and silver washer at drive yoke.
20. Replace the 2 silver timer mounting screws.
21. Return bypass to service position. Water pressure automatically builds in tank.
22. Check for leaks.
23. Plug electrical cord into outlet.
24. Set time of day and cycle the control valve through an immediate regeneration to assure proper
function.
25. Replace the Power Head back cover.