INSTALLATION INSTRUCTIONS - continued
F. ADJUSTMENTS ASSOCIATED WITH
INSTALLATION
Each oven section and all its component parts have
been tested thoroughly and inspected before the
oven was shipped from the factory. However, it is
sometimes necessary to further test or adjust the
oven once it has been installed. Such adjustments
are the responsibility of the Dealer or Installer. These
types of adjustments are not considered defects,
rather a normal and routine part of the proper
installation of the equipment.
These adjustments include but are not limited to:
Adjustments and recalibration of the thermostat
Adjustment to the doors.
Leveling.
Tightening of fasteners.
No installation should be considered
complete without proper inspection and, if
necessary, any adjustments by qualified service
or installation personnel.
G. FLUE GUARD INSTALLATION
1.) Partially back-out the two side mounting screws of
the flue vent.
2.) Slide the keyhole slots of the flue guard over the
partially backed-out screws and then down.
3.) Tighten the two screws.
8
SIDE MOUNTING SCREWS
FLUE VENT
P/N
600100
FLUE GUARD KIT
H. SECURING DOUBLE STACKED OVENS
1.) On rear of the top oven remove two existing screws
that are located at the lower right hand corner.
2.) On rear of bottom oven remove two existing screws
that are located at the upper right hand corner.
3.) Install stacking bracket using the existing screws
as shown in figure.
4.) Repeat steps to install 2nd stacking bracket on
left hand side.