3S TE100 Kullanım Kılavuzu - Sayfa 18

Medya Dönüştürücü 3S TE100 için çevrimiçi göz atın veya pdf Kullanım Kılavuzu indirin. 3S TE100 20 sayfaları.

5.

Maintenance

5-1
Maintenance of Flame-Proof version.
1.When performing maintenance on Flame-proof version, never remove the terminal box
cover or main cover while the power is connected.
2. Always turn off the power before performing any maintenance or repair work.
5-2

Periodic Inspection

Performing periodic inspection and maintenance of the I/P Converter will help reduce the
incidence of faults and extend the working life of the unit.
<Supply pressure filter>
・A metal mesh is fitted inside the SUPPLY coupling. Use a pair of tweezers or similar to
remove any sealing tape or dirt particles caught in the mesh.
<Fixed orifice assembly>
・The fixed orifice plays an important role in supplying the air to the nozzle. If no nozzle back
pressure is present, this may indicate a blocked orifice.
・Take off the exhaust cover, then remove the fixed orifice assembly from the pilot relay unit
and replace with a spare assembly. (See Figure 5-1)
・If you do not have a spare fixed orifice assembly, use [phi]0.3 piano wire or similar to clean
the blocked orifice. Then use clean air to blow off any remaining dirt.
・When finished cleaning, screw the assembly back into its original position. Take care to
ensure that the O-ring is positioned correctly in the body of the pilot relay unit.
Figure 5-1
5-1