AOK AOK-75WiP Kurulum Talimatı - Sayfa 3
Dış Mekan Işığı AOK AOK-75WiP için çevrimiçi göz atın veya pdf Kurulum Talimatı indirin. AOK AOK-75WiP 3 sayfaları. The courtyard lamp
Ayrıca AOK AOK-75WiP için: Kurulum Talimatı (3 sayfalar), Kurulum Talimatı (3 sayfalar)
Step 3: pass the wire rope through the lifting bracket, adjust the position of the fixing block, and tighten the screws with the
hex wrench to fix the position
3
steel wire rope
Lifting scaffold
Set screws(2)
Step 4: Wiring, connect the L,N,GND wires on the lamp to the corresponding L,N,GND cables on the conduit.
4
steel wire rope
Lifting scaffold
Set screws(2)
This one rotates
fixed block(2)
The lamp body
weight:8.5kg(max)
fixed block(2)
The lamp body
weight:8.5kg(max)
4mm Allen wrench
steel wire rope
hexagon socket head
cap screw(6)
Lifting scaffold
Set screws(2)
N
N
L
L
GND
GND
Connect the wires
*AC L(Brown or Black)
*AC N(Blue or White)
*AC (Green/Yellow or Green)
Position the retaining block
fixed block(2)
The lamp body
weight:8.5kg(max)