Dunster House ADAM II H4-1824ASH Kurulum Kılavuzu - Sayfa 12
Bahçe Evleri Dunster House ADAM II H4-1824ASH için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Dunster House ADAM II H4-1824ASH 15 sayfaları.
STEP 10: CORNER TRIM
Items:
4x
ST-PT15151860 (Corner trim)
40x 30mm NAIL
Detail of shed's corner with corner trim
(View from the top.)
Front wall shiplap
STEP 11: DRIP TRAY
Items:
1x
ST-PT2023850 (Drip tray)
3x
35mm SCREW
Side view
Shiplap
Drip tray
35mm SCREW
Front view
Assembly Steps
Pre-drill parts before fixing with screws
10a) Position the timber trims in each corner of the shed, as shown in the diagram
below. Make sure that the end of trim is flush with the bottom wall shiplap.
10b) Fix each corner trim into both panels. Use 8-10x 30mm nails per each corner
trim.
Principle of corner trims installation
Side wall shiplap
Corner trim
30mm NAIL
11a) Position the drip tray to correct position as shown in the diagram below. Keep
same overhang of drip tray on each side of the door.
11b) Fix the the drip tray into the front wall frame (represented by dashed lines) by
using 3x 35mm screw.
Principle of drip tray installation
Front panel frame
Drip tray
Approx. 60mm
35mm SCREW
Corner trim
Flush
Pre-drill parts before fixing with screws
Corner trim
30mm NAIL
35mm SCREW
Corner trim
Drip tray
Page 12