Dunster House H4-2418DSHV2 Kurulum Kılavuzu - Sayfa 14
Bahçe Evleri Dunster House H4-2418DSHV2 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Dunster House H4-2418DSHV2 16 sayfaları. Dad's shed i - 2.4m x 1.8m (8ft x 6ft)
STEP 12: WIND BRACE
Items:
4x
ST-PT35351830
2x
ST-PT3535450
22x 35mm SCREW
Principle of wind braces installation
Front view
35mm Screw
ST-PT35351830
Side view
35mm Screw
STEP 13: FELT
Items:
1x
Felt
320x 10mm CLOUT NAIL
Principle of felt installation
Fix overlaps onto wind braces after
each layer has been attached. see
image for reference (1.0)
Felt Layer 1
Assembly Steps
Pre-drill parts before fixing with screws
12a) Position the wind braces as shown in the diagram below. Make sure that they
are flush with edge of the roof board.
12b) Fix each wind brace by using 35mm screws. Use 6 screws for the front and rear
wind brace. Use 5 screws for the side wind brace. Refer to the image below for more
information.
ST-PT3535540
ST-PT35351830
Pre-drill parts before fixing with screws
13a) Place the Felt layer 1 onto the roof boards and ensure there is an
80mm overhang on the rear and sides. Secure the felt with 10mm clout nails
approximately 70mm apart. Do this all around the first layer of felt as shown
below.
13b) Position the Felt layer 2 so it overlaps the felt layer 1 by approximately
200mm. Secure the felt layer 2 with 10mm clout nails 20mm from the edge
of the felt and 70mm spacing between the clout nails.
13c) Repeat the same process as the previous step for the felt layer 3.
Felt Layer 2
Felt Layer 3
Position of wind braces
FRONT
Principle of felt overlap (1.0)
Felt
10mm COUT NAIL
(Distance between
nails approx. 70mm)
Page 14