3Ware 9550SXU Kurulum Kılavuzu

Kontrolör 3Ware 9550SXU için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. 3Ware 9550SXU 4 sayfaları. Remote battery board
Ayrıca 3Ware 9550SXU için: Şartname (7 sayfalar)

Remote Battery Installation
Guide
The remote battery board is intended for use with a 3ware
9550SX(U), 9650SE, or 9690SA RAID controller to mount the
battery off the controller. The remote battery board is optional with
the 3ware 9550SX(U) and 9650SE, but is required with the
9690SA.
Contents of this package
Battery Backup Unit (BBU) control module
Battery
Battery extension cable
Remote battery board with full height bracket
Low-profile bracket for low-profile enclosures.
Remote Battery Installation Guide (this document)

Before You Start

Installation details covered in your 3ware RAID controller
Installation Guide are not duplicated in this guide. Please follow
those instructions on how to:
Install your 3ware RAID controller
Mount the BBU control module on the controller (
mount the battery on the RAID controller)
Primary installation instructions for your Battery Backup Unit
(BBU) are provided in the Installation Guide that came with your
3ware RAID controller. If you do not have a hardcopy, you can
download a PDF of your Installation Guide from
http://3ware.com/support/userdocs.asp.
www.3ware.com
PN: 720-0171-00
Do not
Note:
1