Duomo BX444-Mc Kurulum ve Kullanım Kılavuzu - Sayfa 9
Gaz Dedektörleri Duomo BX444-Mc için çevrimiçi göz atın veya pdf Kurulum ve Kullanım Kılavuzu indirin. Duomo BX444-Mc 9 sayfaları.
Ayrıca Duomo BX444-Mc için: Manuel (12 sayfalar)
Commissioning
It is strongly recommended that this detector should be commissioned by Duomo Commissioning
Engineers or engineers approved by Duomo to carry out this work. A quotation for commissioning or service will
be provided upon request. Fax site details and preferred date for commissioning to 01905 774296 and the Duomo
Service Department will fax back confirmation.
The benefits of this equipment being commissioned by Duomo are:
On board spares. If for whatever reason this equipment doesn't function correctly Duomo engineers will have spares
on board to ensure that the commissioning is successful.
A Duomo Commissioning Certificate is provided.
It is prudent to make electrical connection to the detector terminal plus when withdrawn and leave the plug off
the detector so that the Duomo Engineer is the first to power up the unit on site. This allows wiring to be checked
prior to commissioning and avoids damage due to incorrect connection. Guarantees for this product will become void
if damage is caused by the installer.
Maintenance
This detector must be function checked as described above using calibrated test gas every 6 months. To arrange for
a Duomo engineer to conduct this work or to arrange a service contract please call 01905 797989.
w: www.duomo.co.uk
-
-
t: 01905 797989
-
f: 01905 774296
|
© Duomo (UK) Ltd. 2016