DANLERS BMPIRSP Kurulum Notları - Sayfa 2
Aksesuarlar DANLERS BMPIRSP için çevrimiçi göz atın veya pdf Kurulum Notları indirin. DANLERS BMPIRSP 2 sayfaları. Batten mount pir occupancy switches
Installation procedure
1. Please read these notes carefully before commencing work.
In case of doubt please consult a qualified electrician.
Make sure the power is isolated from the circuit.
2. Remove the 20mm knockout from the end of the lighting batten.
3. Making reference to diagram A: Remove the 20mm thread from the
PIR and insert it through the 20mm knockout hole with the thread
facing outwards
4. Feed the trailing wires through the thread and with the PIR facing
downwards tighten the 20mm thread.
5. The trailing wires should be connected to the ballast as:
Brown - Live supply. Blue - Neutral supply. White - Switched Line to ballast.
6. Once the wiring has been completed and verified, switch on the supply
and test the operation.
Set-up
7. When powered up, (after 1 minute stabilisation time) turn lux pot
fully clockwise and time pot fully anticlockwise.
8. Press the button for approximately 0.5s. The LED will go green indi-
cating the LUX cell is active. (Or press and hold button for approx. 4
seconds – LED goes RED indicating Lux cell INACTIVE). Repeating
these steps will toggle the functionality.
9. If lux cell active, vacate area until PIR switch switches the load off
(should be after 10 seconds).
10. With the LUX as desired on desktop from daylight ONLY (no artificial
light), wind the lux pot anticlockwise whilst waving your hand in front
of the PIR cell. When the PIR switches the load ON, stop turning the
pot. The Lux inhibit level is now set.
11. Turn the PIR time to the desired timeout.
Precondition
Power-up Condition
Lux Cell Inactive
Lux Cell Inactive
Relay OFF
Relay comes ON for 1 Min. After 1 min. ready for detection.
Lux Cell Active
Lux Cell Active
Relay ON
Relay stays ON for 1 Min. After 1 min. ready for detection.
Lux Cell Active
Lux Cell Active
Relay OFF
Relay comes ON for 1 Min. After 1 min. ready for detection.
Lux Cell Inactive
Lux Cell Inactive
Relay ON
Relay stays ON for 1 Min. After 1 min. ready for detection.
A: Installation diagram,
viewed from below
B: Detection range
BMPIR5M
For optimum
coverage
100°
recommended
mounting
height: 2.4
to 5m
up to 5m
BMPIRSP
For optimum
coverage
recommended
mounting
20°
height: 2.4
to 5m
up to 1.5m
C: Lux
adjustment
D: Time
adjustment
To light
fitting
ballast
BMPIR10M
For optimum
coverage
112°
recommended
mounting
height: 2.4
to 5m
up to 10m
BMPIRRH
For optimum
coverage
100°
recommended
mounting
height: 2.4
PIR head - key components
PIR Lens
Lux cell
Lux setting
Lux Cell
Time
delay
setting
Dual colour LED
RED - PIR active, Photocell inactive
GREEN - PIR and Photocell override ON (passive LUX)
Mode