Construction Solutions DBX1000 Kurulum ve Ürün Kılavuzu
Fan Construction Solutions DBX1000 için çevrimiçi göz atın veya pdf Kurulum ve Ürün Kılavuzu indirin. Construction Solutions DBX1000 2 sayfaları. Recessed vent receptacle
Construction Solutions
7801 E. Gray RD Suite 110
Scottsdale, AZ 85260
www.newconstructionsolutions.com
Material used in the DBX 1000 meets UL94 HB Flammability Testing and is recognized by Underwriters Laboratories Inc.
Representative samples of this component have been evaluated by UL and meet applicable UL requirements.
For optimum results, install the DBX1000
Box Installation - 16 Inch On-Center Spacing:
1. Orient box to match desired venting direction, score & remove appropriate top or rear 4-inch oval vent pipe
knock out. Allow minimum of 4 inches of vent of pipe to extend inside box
2. If gas line is to be installed, locate 1⅝ straw clamp on top of box. Cut the webs between the 8 fins with a
utility knife. Push the gas line through the straw clamp. The fins will flex inward holding the pipe.
3. Slide box into position taking care to correctly align vent pipe and gas pipe (if present).
4. Spacing tabs will automatically position box so that bottom, inside edge is from 2¼ to 2⅝ inches above
unfinished floor to allow clearance between trim ring and finished floor covering. Tabs may be removed if a
different spacing is desired.
5. Attach box directly to both right and left studs using the six flange screw holes. Screws are recommended for
mounting.
Box Installation - 24 Inch On-Center Spacing:
1. Orient box to match desired venting direction, score & remove appropriate 4-inch oval vent pipe knock out.
Allow minimum of 4inches of vent of pipe to extend inside box.
2. If gas line is to be installed, locate 1⅝ straw clamp on top or bottom of box. Cut the webs between the 8 fins
with a utility knife. Push the gas line through the straw clamp. The fins will flex inward holding the pipe.
3. Slide box into position taking care to correctly align vent pipe and gas pipe (if present).
4. Spacing tabs will automatically position box so that bottom, inside edge is from 2¼ to 2⅝ inches above
unfinished floor to allow clearance between trim ring and finished floor covering. Tabs may be removed if a
different spacing is desired.
5. Attach one side of box directly to stud using the three flange screw holes.
6. Snap in the two mounting straps on the other side of the box and attach these to the second stud using the
strap screw holes. Screws are recommended for mounting.
Trim Instructions:
1. Snap out left or right trim ring "cut out" (see detail below).
2. Leave 1¾ inches between inside edge of box and
end of baseboard to allow for trim ring clearance.
3. Snap trim ring into opening, no caulking required.
4. Leave unfinished or paint with desired color.
Ph: (480)346-8240
Fax: (480) 346-8250
®
recessed vent receptacle for 4 Inch Walls as follows:
Box made from High Impact Polystyrene ("HIPS")
Meets UL94 HB Flammability Testing
Install in up to 24" on center location, brackets included
Easy to remove 4" oval knockouts
Top and Bottom Straw clamps for gas pipe
Snap on trim ring accommodates up to ¾" drywall
US Patented Product 6,938,640
DBX1000 Recessed Vent Receptacle
Installation Guidelines &
Product Information
⅛
⅛
⅛
⅛
17
17
17
17
¾
¾
¾
¾
13
13
13
13
¾
¾
¾
¾
1
1
1
1
⅛
⅛
⅛
⅛
17
17
17
17
Snap On Trim Ring
Top Oval Clearance
Top Oval Clearance
Notches
Notches
¾
¾
¾
¾
13
13
13
13
¼"
¼"
¼"
¼"