Duratuf MK4A Montaj Talimatları Kılavuzu - Sayfa 8
Dış Mekan Depolama Duratuf MK4A için çevrimiçi göz atın veya pdf Montaj Talimatları Kılavuzu indirin. Duratuf MK4A 16 sayfaları. Kiwi series, base size 4.210mm x 2545mm
MK4A LOUVRE WINDOW (Optional)
Step 1: Lay out the two window studs (883mm) and
Nog (634mm) on a flat surface. Position
Nog and nail in place using 2x 75mm nails
at each end.
Step 3: Nail wall Sheets to window framing using
30mm clouts. (return to step 4 on page 7
and complete). Then fit Window Frame).
Position Window Frame centrally on win-
dow opening and rivet it to ribs. Pre-drill
holes in each corner and nail Window
Frame to framing, using 50mm nails.
Step 5: Rivet Over Panel to the Window Frame
with rivets.
588mm
50mm
NAILS
RIVITS
Step 2: On the inside of the shed, position studs
and Nog centrally on window opening.
Make sure the studs are parallel and nail
into Top Plate and end wall Nog.
Step 4: If the Window is in the gable end, tempo-
rarily position the Over Panel above Win-
dow Frame. Following the same angle as
the gable, mark and cut to suit.
Step 6: From the inside of the shed, slide Louvre
Glass into Louvre Units attached to the
Window Frame. Bend up tabs to keep
Glass in position.
8