ROOF ASSEMBLY CONT...
STEP 3:
• Position 1 x roof sheet so that the top of the sheet is at the cen-
tre of the Ridge Beam and the side of the sheet over hangs the
end of the Ridge Beam and the Top Plate by 15mm.
• Ensure the Ridge Beam and the Top Plate are straight.
• Nail /screw 4 x corners of the Roof Sheet as shown, ensuring
the ribs on the Roof Sheet line up with the front Roof Sheet and
the back Wall Sheet. Fasten off the first sheet.
STEP 4:
• Position the second Roof Sheet, and rivet to first roof sheet as
shown.
• Fasten off as per Step 2.
• Rivet and nail/screw off the remaining Roof Sheets, ensuring the
ribs line up with the front Roof Sheets and the back Wall Sheets.
STEP 5:
• Place barge flashings on roof at end of shed
ensuring the diagonal trimmed end is facing
out. (See diagram on pg 5)
• Rivet the Barge Flashings to the roof and
the side wall, using four rivets on top of
barge and four into the side (fig.3).
STEP 6:
• Rivet the 2 Ridge Caps together using 4
rivets, so total flashing is 3.050m long. Rivet
the Ridge Flashing to the centre of the roof
using 10 x rivets as shown (fig.2).
STEP 7:
• Place spouting in position and rivet to Barge Flashings at
each end and rivet to roof sheets (1 rivet per 1 sheet) (fig.4).
SIDE
WALL
SIDE
WALL
BACK WALL
RIDGE
SIDE
WALL
Barge
X 4
fig.3
13
TOP PLATE
BACK WALL
BOTTOM PLATE
FRONT WALL
TOP PLATE
BACK WALL
BOTTOM PLATE
FRONT WALL
= Clout
= Screw
TOP PLATE
BOTTOM PLATE
WALL
FRONT
WALL
X 4
Spouting