Duratuf Sentry SG3030 Montaj Talimatları Kılavuzu - Sayfa 15
Bahçe Evleri Duratuf Sentry SG3030 için çevrimiçi göz atın veya pdf Montaj Talimatları Kılavuzu indirin. Duratuf Sentry SG3030 16 sayfaları.
SECURING SHED
Secure your shed using Treated Timber Pegs or a Bolt Down Kit
TIMBER PEGS—WOODEN FLOOR
• The optional Duratuf Timber Peg Down Kit includes six H5 treated timber
pegs that can be hammered into the ground and then attached to the
Base Plate with stainless steel screws. A Sentry timber floor can then be
fitted on top of the Base Plate.
BOLT DOWN KIT—CONCRETE
• The optional Duratuf Bolt Down Kit includes 6 x galvanised
brackets, screws and dynabolts.
• Space the brackets evenly around the shed and fix to the Bottom
Plate and the concrete slab. A 10mm masonry drill bit is required.
OPTIONAL SENTRY FLOOR
• Position the Floor Joists centrally between the side
Base Plates and skew nail each end with two 75mm
nails.
• Check that the shed is sitting level and square and
that the diagonal Bottom Plate measurements are the
same.
• Place the Floor Boards in position. (You may need to
cut the last Floor Board to the correct width using a
Skill Saw.) Nail each Floor Board in, using two 50mm
nails each end and two nails into each floor joist.
FIT PADBOLT
• Rivet Padbolt to door and keeper onto Door Jamb as
shown.
FIT BACK PADBOLT
•
Rivet back pad bolts to pad bolt supports then rivet pad bolt sup-
ports to back of small door (Top and bottom)
•
Using 10mm drill bit, drill hole into top and bottom timber plates
IMPORTANT— CLEAN UP
REMOVE ALL DRILL FILINGS FROM ROOF, WALLS AND CHANNELS
THOROUGHLY. FAILURE TO DO THIS WILL RESULT IN CORROSION
AND COULD THEREFORE VOID THE WARRANTY
YOUR DURATUF SENTRY SHED IS NOW COMPLETE. RELAX......
.
14
BACK BASE PLATE
JOIST
JOIST
JOIST
JOIST
FRONT BASE PLATE