Duratuf KIWI KL1 Montaj Talimatları Kılavuzu - Sayfa 6
Dış Mekan Depolama Duratuf KIWI KL1 için çevrimiçi göz atın veya pdf Montaj Talimatları Kılavuzu indirin. Duratuf KIWI KL1 16 sayfaları.
TO AVIOD CORROSION:
•
Where at all possible try not to trap metal filings between two sheets. Remove all metal filings before riveting.
•
Carbon in pencils reacts with the Zinc/Aluminium coating on steel. Use either crayon or ink to mark steel.
TERMS EXPLANATION
•
To Tack: To Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position. Should a Wall
Sheet need to be re-positioned, the nails can easily be prized out.
•
If a window is required, identify Wall Sheet(s) with window hole pre-cut. Lean up Wall Sheets where window(s) are to be located.
KL1 WALL CLADDING
CLADDING DETAIL
Birds Eye View
fig. 1
6