Note:
For sheds with the Raised Base Plate option,
the Wall Sheets will protrude 20mm below the
Bottom Plate. Refer to Raised Base Plate sec-
tion (page 14).
Step 1: Front Wall: Start at the left hand side. Posi-
tion the Wall Sheet with the LIP on the left hand
side. Ensuring the LIP is flush with side of the
Stud and the top of the Top Plate, tack in place.
Repeat with Wall Sheet on the right hand side
of doorway.
Step 2: Back Wall: Position the first Wall Sheet with
the LIP on the right hand side. Ensuring the LIP
is flush with the side of the Studs and the top of
the Wall Sheet is flush with the top of the Top
Plate, tack in place. Position the next Wall
Sheet with the LIP on the right hand side. Over-
lap as shown in (fig 1). Ensuring Wall Sheet is
flush with top of Top Plate, tack in place. Re-
peat with remaining sheet.
Step 3: End Walls: Lean Gable Wall Sheets against
the shed to form gable shape. With the LIP
flush with side of Stud tack in place ensuring
the bottom of the Wall Sheet is 10mm above
the bottom of the Bottom Plate. Tack on re-
maining Wall Sheets. Repeat with other gable
end. If fitting a window, nail in Window Studs
and Nog now. Refer to Window instructions.
Step 4: Nailing Off: Nail one 30mm Clout each side of the Rib (two per Pan) into the Top Plates and Bottom
Plates. Nail
30mm Clouts evenly spaced.
Gable Ends: When nailing Gable Wall Sheets to the Top Plate, use a String Line. At the top of the gable nail two
30mm Clouts into the end of the Ridge Beam. This will stop it from twisting.