CB2 MONOLITH Montaj Talimatları Kılavuzu - Sayfa 3

İç Mekan Mobilyaları CB2 MONOLITH için çevrimiçi göz atın veya pdf Montaj Talimatları Kılavuzu indirin. CB2 MONOLITH 13 sayfaları. Wardrobe
Ayrıca CB2 MONOLITH için: Montaj Talimatları Kılavuzu (6 sayfalar)

CB2 MONOLITH Montaj Talimatları Kılavuzu
monolith
NOTE:  Make sure arrows
of each cam points towards
nearest edge with holes
A
large fixed
shelf
B
small fixed
shelf
A. Insert 4 cams into large fixed shelf as
shown. Make sure arrows of each cam points
towards nearest edge with holes.
B. Insert 4 cams into small fixed shelf as
1
shown.
A. Insert 2 cams into base as shown.
B. Insert 2 cam screws into top panel as
3
shown.
Made in Vietnam - r03
WARDROBE (LEFT)
A
base
B
top panel
Customer Service 800.606.6252  |  Latest instructions available at www.cb2.com
NOTE: Do not
over tighten the
cam screws
B
partition
A. Insert 10 wood dowels and 5 cam screws
into right and left side panels as shown, using
a phillips head screwdriver. Do not over
tighten the cam screws.
B. Insert 12 wood dowels, 8 cam screws, 2
2
cams into partition as shown.
large fixed
shelf
partition
small fixed
shelf
Fit 2 small fixed shelves and 2 large fixed
shelves onto corresponding dowels of partiton
as shown. Using a screwdriver, turn each cam
4
clockwise until it securely engages each cam
screw.
A
left and right
side panels
Page 2 of 6