CB2 THE WALL Montaj Talimatları - Sayfa 3
İç Mekan Mobilyaları CB2 THE WALL için çevrimiçi göz atın veya pdf Montaj Talimatları indirin. CB2 THE WALL 5 sayfaları. Wardrobe
Ayrıca CB2 THE WALL için: Montaj Talimatları (4 sayfalar)
the wall
top
panel
A. Insert 4 dowels into assembly as shown.
B. Fit top panel onto dowels of assembly and
5
secure with 4 short bolts.
With assistance, position holes in hinges over
corresponding holes in side panel. Secure each
7
door with 4 screws per hinge.
Made in Vietnam - r04
WARDROBE
Customer Service 800.606.6252 | Latest instructions available at www.cb2.com
A
A. Fit 3 hinges into each door as shown and
attach with 2 screws per hinge.
B. Attach 1 pull to each door and secure with 2
6
screws per pull.
Attach 1 crossbar to the underside of each
8
adjustable shelf with 3 long bolts.
B
A
B
adjustable
shelf
crossbar
Page 3 of 5