Datapath VSN900X Kullanıcı Kılavuzu - Sayfa 5

Şasi Datapath VSN900X için çevrimiçi göz atın veya pdf Kullanıcı Kılavuzu indirin. Datapath VSN900X 20 sayfaları. Expansion chassis

Unpacking

The expansion chassis is heavy, lifting precautions should be taken.
Inspect items for damage. Should any items show any signs of damage, report it immediately to your
vendor.
Normal electrostatic handling precautions should be observed when installing PCIe cards and cables,
these items incorporate sensitive electronic components. Care should be taken to avoid dust ingress
to the cable connectors or excessive voltage or current surges.
All packaging should be retained for future shipping requirements.
Packing List
Depending on the solution ordered, your packing box should contain a combination of:
VSN900X
VSN900X-Optical
VSN1100X
VSN1100X-Optical
ExCable
ExCable-Optical/50
ExCable-Optical/100
HLink-G3
HLink-Optical
SLink-G3
SLink-Optical
Half Size Bracket
User Manual
* If the VSN expansion chassis is supplied as part of a completely configured system with a VSN host
machine then the HLink-G3/HLink-Optical card will be pre-installed.
9 slot expansion system providing 8 PCIe Gen3 x4 slots & 1 PCIe
Gen2 x8 slot & 1 x8 PCIe Gen3
9 slot expansion system providing 8 PCIe gen3 x4 slots & 1 PCIe
gen2 x8 slot & 1 x8 PCIe Gen3
11 slot expansion system providing 11 PCIe Gen3 x8 slots
11 slot expansion system providing 11 PCIe Gen3 x8 slots
1 metre copper cable
50 metre optical cable
100 metre optical cable
Gen.3 host link card*
Optical Gen.3 host link card*
Gen.3 slave link card. (The SLink-G3 is pre-installed in all
VSN900X/1100X chassis)
Optical Gen.3 slave link card. (The SLink-Optical is pre-installed
in all VSN900X-Optical/1100X-Optical chassis)
Supplied with HLink-Optical card
5