Gage Bilt GB108 Orijinal Talimat Kılavuzu - Sayfa 13
Araçlar Gage Bilt GB108 için çevrimiçi göz atın veya pdf Orijinal Talimat Kılavuzu indirin. Gage Bilt GB108 16 sayfaları. 20v battery installation tool
Providing all maintenance conditions have been met, follow this systematic approach to diagnosis.
1. INSTALLTION TOOL STOPS AND A RED LED COMES ON.
a.) Fasteners are used beyond the specified performance capability of the tool. Wait until the LED goes out and press the
actuator assembly (VP1316) briefly again. The tool then moves to its starting positions.
2. THE INSTALLATION TOOL COMPLETES THE CYCLE THEN STOPS.
a.) The battery (VP1086) is dead. The tool is protected by a protection circuit. The LED lights up yellow. Replace the battery
with a fully charged one. The yellow LED goes out and you can continue working.
3. THE INSTALLATION TOOL DOESN'T WORK WITH A FULLY CHARGED BATTERY.
a.) Ensure mandrel collection bottle (VP1002) or cover cap (VP1321) is securely mounted and fully engaged in the rear of the
installation tool activating the safety switch. (See page 9).
GB108 20V BATTERY INSTALLATION TOOL S/N: 1143 AND ABOVE
PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
TROUBLESHOOTING
Fault Indicator (Red / Yellow LED)
Image may not reflect actual tool
13
Cover Cap (VP1321)
7/21 REV 12/22