Great Lakes GL24SRD Kurulum Talimatları Kılavuzu - Sayfa 6

Raflar ve Standlar Great Lakes GL24SRD için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Great Lakes GL24SRD 12 sayfaları. 19" eia srd swing rack
Ayrıca Great Lakes GL24SRD için: Kurulum Talimatları Kılavuzu (8 sayfalar)

Great Lakes GL24SRD Kurulum Talimatları Kılavuzu
STEP 2
Mount the rear assembly to the wall with four lag screws (not provided).
Mounting locations are as shown.
Install the 19" EIA Swing Frame by retracting both pins. The pins can be locked
out for ease of assembly by retracting the outside pin into the slot provided.
The retractable pins are to be near the front of the Swing Frame when
installing.
Release the lower pin then, align the top pin to the top receptacle and release
pin. Place 1/4-20 Screw through the hole in bottom (opposite pin hinge).
Assemble spacer on exposed threads on inside of swing rack and close swing
frame. Tighten screw by screwing into pem nut in Swing Frame. Repeat screw/
spacer assembly for top. Finally, tighten 8 screws on the top and bottom
braces.
8
Install ground lug and jumper wire as shown in Detail A and B.
D
C
Mounting
Location;
2 on top,
2 on bottom
B
Receptacles for
Pivot Pins: 1 in
top, 1 in bottom
A
3
2
8
DETAIL A
Earthing
Symbol
6
7
4
1/4-20 keps nut
1
7
DETAIL A
SCALE 1.5
6
3
1/4-20 x 5/8" Phil
Pan Head Screw
Ground
Lug
A
Retractable Pivot Pins; 1 on top, 1 on bottom
6
DETAIL B
D
Ground
Lug
B
C
5
4
1/4-20 x 3/4" Flat Head
Screw
1/4-20 Nylon
2
Locking Pellet
Ground
Wire
DETAIL A
SCALE 1.5
5
4
DETAIL B
SCALE 0.90 : 1
3
1
D
C
B
B
3
1/4-20 bolt
B
1/4-20
keps nut
Jumper Wire
1/4-20 keps nut
A
D
SCA