Great Lakes UL60950-1 Kurulum Talimatları Kılavuzu - Sayfa 5

Muhafaza Great Lakes UL60950-1 için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Great Lakes UL60950-1 13 sayfaları. 4 post equipment racks
Ayrıca Great Lakes UL60950-1 için: Kurulum Talimatları Kılavuzu (8 sayfalar), Kurulum Talimatları Kılavuzu (12 sayfalar)

Great Lakes UL60950-1 Kurulum Talimatları Kılavuzu
OPERATING DOOR HANDLE
The door swing handles have been installed and no additional
assembly is required. To operate the swing handle, lift up at the
bottom of the handle to open.
OPERATING DOOR SWING HANDLE
Swing the handle to the left or
right to open. The handle must
OPERATING DOOR SWING HANDLE
be kept in this position to close
the door. Return the handle
to the initial position
and use the key provided
to lock the handle. The
lock on the side panels
will accept the same key.
The swing handles and
doors are reversible. The
exploded view shows its
construction.
DOOR REMOVAL AND ATTACHMENT
Open the door beyond 90
carefully lift upward. When the door is free of both hinge pins, pull the
door away from the cabinet. To attach the door, align both hinges of
the door to their respective hinge pins on the cabinet and slowly slide
the door down until seated.
DOOR REMOVAL AND ATTACHMENT
o
, grasp the door with both hands and
Open
door
beyond
90
; lift
o
straight
up
Hinge
Hinge Pin
Door
Align
both
hinges
to attach
door
5